Search is currently limited to the Newsroom. Broaden your search to all hydroquebec.com sites.
Search
131 - 140 results of 966
The Electric Circuit launches a pilot project on heavy vehicle charging
Montréal, October 25, 2022
Press Release
To support the expansion of electric transportation in Québec, the Electric Circuit is launching a pilot project on heavy- and medium-duty vehicle charging. The initiative includes the installation of dedicated ...Hydro-Québec and the Ville de Montréal join forces to preserve the Boisé Steinberg and build the new Hochelaga substation
Montréal, October 24, 2022
Press Release
Hydro-Québec and the Ville de Montréal have moved one step closer to building the new Hochelaga substation and preserving the wooded area known as the Boisé Steinberg.Hydro-Québec to participate in Québec government committee on the energy transition and the economy
Montreal, October 20, 2022
Press Release
Hydro-Québec welcomes the Québec Premier’s decision to set up and personally chair a new committee dedicated to the energy transition and the economy.Hydro-Québec - issue of medium term notes 2.00% due september 1, 2028 on the canadian market
Montréal, October 20, 2022
Press Release
Hydro-Québec announces that it has negotiated on the Canadian domestic market the issue of new notes totaling CA$600,000,000, Series 0082 maturing on September 1, 2028, under its Canadian Medium Term ...Hilo integrates Mysa thermostats into its ecosystem
Montréal, October 13, 2022
Press Release
Hilo has announced a new partnership with Canadian manufacturer Mysa, whose smart thermostats will be streamed into the Hilo ecosystem just in time for Hilo’s winter 2023-2024 challenges.Hydro-Québec to acquire 13 hydropower generating stations in New England
Montréal, October 12, 2022
Press Release
HQI US Holding LLC, a wholly-owned subsidiary of Hydro-Québec, has entered into an agreement to acquire Great River Hydro, LLC, which owns 13 hydropower generating stations with a total installed ...End of work at Chelsea generating station and lowering of the river’s water level
Gatineau, September 26, 2022
Press Release
Refurbishment work at Chelsea generating station is on schedule and Hydro-Québec expects it to be completed by the end of November.Improving electricity service quality in Brossard: Hydro-Québec takes action.
Saint-Bruno-de-Montarville, September 23, 2022
Press Release
Following a productive discussion about the electricity service quality issues facing Brossard residents, Mayor Doreen Assaad, Hydro-Québec President and CEO Sophie Brochu and Éric Filion Executive Vice President – Chief ...Hydro-Québec – Issue of Debentures Due February 15, 2063 on the Canadian Market
Montreal, September 15, 2022
Press Release
Hydro-Québec announces that it has negotiated on the Canadian domestic market the issue of CA$500,000,000 of Debentures, Series JS, maturing on February 15, 2063.EVLO Energy Storage Inc. inaugurates a first international facility in France
Montréal, September 15, 2022
Press Release
EVLO Energy Storage Inc. (“EVLO”) participated in today’s inauguration of Innergex’s Tonnerre facility in the Bourgogne-Franche-Comté region. This 9 MW / 9 MWh battery energy storage system will enhance the ...131 - 140 results of 966